- Waukesha, WI – 2,750 sf
MetalTek is a leading supplier of metal castings for high temperature, wear and corrosion environments and high-compliance industries. MetalTek required a facility built for X-ray and Gamma ray testing. Pinnacle built a radiation containment facility, with four-foot thick walls. Very tight security meant coordination that would allow access for all subcontractors. In addition, the construction was done throughout the winter. The project’s most sizable challenges included construction of this concrete building during winter and the installation of an 80-ton door.